Quotes Needed for Water Treatment Technology Services by CDCR

CDCR Seeking Maintenance, Calibration and Repair Services for SCADA System at California State Prison Solano Water Treatment Plant

The California Department of Corrections and Rehabilitation (CDCR) is looking for maintenance, calibration, inspection, and repair services for the Supervisory Control and Data Acquisition (SCADA) system at the California State Prison, Solano water treatment plant. The performance period for this agreement is from July 1, 2024 to June 30, 2027 with an initial agreement not exceeding $180,000 as stated in the RFQ documents.

If it is deemed in the best interest of CDCR, the resulting agreement may be amended to extend the term and/or increase funding consistent with the original Scope of Services. Interested vendors should ensure they complete a mandatory walk-through of the facility before submitting a quote package. Walk-throughs must be scheduled through Martha Gallegos and Billy Ray Butler before April 5. The deadline to submit a bid package is 2 p.m on May 7. Ashley Koewler is the point of contact for this RFQ.

Leave a Reply

David McBride named Chief Technology Officer of Supernal, to spearhead development of air taxi services Previous post NASA Veteran David McBride Joins Supernal as Chief Technology Officer to Lead Electric Air Taxi Development
Fortum’s Board Composition Decided at General Meeting Next post Fortum’s General Meeting Elects New Board Members and Approves Dividend, Acquisition Authorization